Miami-Dade · Broward · Palm Beach · Mon–Sat 8 AM–6 PM
Answer a few questions about your panel and what you plan to add. You get a call back within 2 hours during business hours, Monday to Saturday, 8 AM to 6 PM. Then an electrician looks at the panel and writes the price down.

Panel upgradeMiami, FL
PANEL UPGRADE
An electrical panel upgrade replaces the box that feeds every circuit in your home, usually to go from 100 amps to 200 amps or to retire an outdated panel. HVACServicesFlorida.com takes your request and calls you back. One licensed and insured contractor then looks at the panel and gives you a written quote before any work begins.
A panel replacement is worth a request when one of these fits your home:
Before recommending a size, the electrician checks the service you have, counts the circuits and calculates the load, so the new panel gives your home's electrical system enough capacity for what you run today and what you plan to add. The service covers homes and condos in Miami-Dade, Broward and Palm Beach.
Sparks, a burning smell or a panel too hot to touch is a fire risk and a safety issue, because heat damages the wiring around it. If it is safe to reach the main breaker, switch it off, and if you see smoke or flames, leave the house and call 911. Then send a request. Hours are Monday to Saturday, 8 AM to 6 PM, and a request sent after 6 PM or on Sunday gets a call the next business morning.
Our terms
2 hours
A call back within two hours, Mon–Sat 8 AM–6 PM
Same day
A visit the same day for requests before noon, when a slot is open
2 years
Written labor warranty on repairs and installations
$0 upfront
Repairs are paid after the work is done
OLDER PANELS
Most older panels still work, but an older panel can be a point of failure, and a few brands and designs get extra attention from home inspectors and insurers. The table shows what each one means for a Miami homeowner. If your panel matches a row, the electrician can confirm it by the label on the panel door.
| Panel | What to know | What to do |
|---|---|---|
| Federal Pacific (Stab-Lok) | Never formally recalled, but home inspectors commonly recommend replacing it because its breakers can fail to trip under overload, and overload protection is the job of a breaker | Ask the electrician to check the brand and the breakers |
| Zinsco and Sylvania-Zinsco | Named, with Federal Pacific, on some private insurers' lists of panels they do not accept | Ask your insurance agent what your policy requires |
| Challenger | Appears on some of the same insurer lists | Same check as above |
| Fuse box | Has few circuits and no room for a modern load of air conditioning, appliances and a charger | Have the load calculated before adding anything |
| A panel with no free slots | Works until the next addition, then every new circuit becomes a problem | Plan an upgrade together with the next project |
A number of private Florida insurers decline homes with Federal Pacific, Zinsco or Challenger panels under their own underwriting rules, and the rules differ from one company to the next. A 4-point inspection is an insurer's requirement, not a state law, and the age of the home that triggers it depends on the insurer. The inspector usually notes the panel brand, so ask your agent what your company expects before you order the work.
Service area
Based in Aventura, between Miami and Fort Lauderdale.

Miami, Miami Beach, Aventura, North Miami, Coral Gables, Doral, Hialeah, Kendall, Key Biscayne, Miami Gardens, Miami Lakes, Pinecrest, Palmetto Bay, Cutler Bay, Homestead
Fort Lauderdale, Hollywood, Hallandale Beach, Pembroke Pines, Miramar, Davie, Plantation, Sunrise, Weston, Cooper City, Coral Springs, Coconut Creek, Tamarac, Pompano Beach, Deerfield Beach
Boca Raton, Delray Beach, Boynton Beach, Lake Worth, West Palm Beach, Wellington, Royal Palm Beach, Palm Beach Gardens, Jupiter
HOW IT WORKS
A panel replacement is a short list of steps in a fixed order: look, price, permit, swap, inspect. The electrician walks you through each one, so you know when the power will be off and what comes next. Here is the usual order for a home in Miami-Dade, Broward or Palm Beach.
The electrician checks the service size, the condition of the panel and the circuits, and asks what you plan to add.
Parts and labor go on separate lines. You approve the estimate before work starts.
As a rule, a panel replacement goes through a permit with the building department of your city or county, and the rules differ from one city to the next.
The old panel comes out and the new one goes in with its breakers, and the circuits are reconnected. If the service line has to be disconnected, the electrician arranges it with the utility.
The inspector checks the finished work against the electrical code. Once it passes, the power is back on; if the utility had disconnected the service, it reconnects it.
The power is off while the panel is swapped, so tell the electrician which circuits matter most to you, such as the refrigerator, medical equipment or a home office. How long the outage lasts depends on the job, so ask for the window when you approve the estimate. If a generator is on your list, see standby generator installation, and for old wiring found behind the panel, see house rewiring.
Warranty
The warranty is in your paperwork, along with everything else you keep after the job.
Covers the work on repairs and installations.
With a new system, the equipment is registered for you within the manufacturer's deadline, so the full parts coverage is on file.
Replacement and generator jobs include the permit: filed, inspected and closed.
A photo of the fault and the written estimate before the repair, a completion report and photos after.
The work is done by our licensed and insured partner contractor. You sign the work agreement with the contractor and pay the contractor directly.
PANEL PRICE
The price depends on the size of the new panel, what is already in place and what the permit and the inspection ask for. There is no single number that fits every house, so the written quote here comes after the electrician has seen the panel, with parts and labor on separate lines.
| What changes the price | Why |
|---|---|
| Panel size, 100 A to 200 A | A larger electrical service needs a larger panel, heavier wire and more breakers |
| Condition of the service | An old meter base, mast or service wire may need replacing along with the panel |
| Number and type of circuits | Each breaker adds parts, and arc-fault or GFCI breakers cost more than standard ones |
| Location of the panel | Moving it, or reaching it in a tight closet, adds labor |
| Permit and inspection | Fees and the process differ by city |
| Extras | A whole-home surge protector or grounding upgrades the inspector asks for |
Many people ask whether they need 200 amps at all. Whether 100 A is enough depends on what you run and what you add, such as an EV charger, a tankless water heater or a second air conditioner, and the load calculation settles it before you spend more than you need to. Planning a new air conditioner too? The AC installation page has the packages. The maintenance plan includes a check of the panel, GFCI outlets and detectors, $199 a year, and the details are on the maintenance plan page.
Maintenance plan
Or $18 a month. One plan for the three systems that keep a Florida home running.
Join the planOne plan · three systems
$199a year
or $18 a month
FAQ
The price depends on the panel size, the condition of the existing service, the number of circuits and the permit fees in your city. The electrician looks at the panel first, then writes the price on a written estimate with parts and labor on separate lines. You approve it before any work starts.
As a rule, yes. A panel replacement goes through a permit and ends with an inspection by the building department. Miami-Dade requires permits for electrical work with narrow exceptions, such as swapping a standard switch or outlet. Your city's building department has the final word on a specific job.
The 80% rule is about a continuous load on a single circuit: a 32 A charger needs a 40 A breaker. It is not a limit for the whole panel. Whether 100 amps is enough comes from a load calculation of everything in the house, which the electrician does before recommending a size.
Some private Florida insurers do not accept those panels under their own rules, and the rules differ by company. The electrician can confirm the brand of your panel. Your insurance agent tells you what your policy requires, so ask before you schedule the work.
It depends on the wiring. Replacing the panel does not automatically mean rewiring. The electrician decides after seeing the panel and the wiring that connects to it, and any extra work goes on the written estimate for you to approve first. See house rewiring for what that involves.
The power is off while the old panel comes out and the new one goes in, and the outage depends on the job. Ask the electrician for the window when you approve the estimate, and tell them which circuits you need back first.
Keep clear of it. If it is safe to reach the main breaker, switch it off, and if you see smoke or flames, leave the house and call 911. After that, send a request and the call comes at the next opening.
HVACServicesFlorida.com takes your request and calls you first. One licensed and insured contractor does the work, and labor carries a 2-year written warranty. The panel itself has the manufacturer's warranty, which is separate. You sign with the contractor and pay the contractor directly. The same contractor also handles GFCI outlet repair.
Didn't find your answer?
Ask it on the call. It comes within two hours during business hours.
Request service
Send a request now and expect a call within two hours, Monday to Saturday. The service call is $0 when the repair is done on the same visit.