Miami-Dade · Broward · Palm Beach · Mon–Sat 8 AM–6 PM
Answer a few questions about your car, your garage and your panel. You get a call back within 2 hours, Mon–Sat 8 AM–6 PM, and a written price before any work starts.

Home EV chargerMiami, FL
EV CHARGER INSTALLATION
EV charger installation in Miami starts with a request. HVACServicesFlorida.com takes it and calls you back within 2 hours, Monday to Saturday. One licensed and insured contractor then checks your garage, carport or parking space, your electrical panel and the cable run, and writes a quote down before any work begins.
A Level 2 EV charging station at home runs on 240 volts and adds range to an electric vehicle much faster than a regular outlet. It needs its own circuit and a breaker in the panel. The service covers homes, townhouses and condos across Miami-Dade, Broward and Palm Beach.
The installation covers these steps:
The site check shows first whether the electrical panel can carry a charger. A request sent before noon gets a same-day visit when a slot is open, otherwise the next business day, with a 2-hour window you can schedule around and a text when the contractor is on the way. The same contractor does other local residential electrical services at home.
How it works
A few taps: what's wrong, where, and when you need it. Or call during business hours.
We confirm the problem, the service call price and your arrival window. Requests sent after 6 PM or on Sunday get a call the next business morning.
The same day for morning requests with an open slot, otherwise the next business day. You get a text when the technician is on the way.
You see a photo of the problem and an itemized estimate before the repair starts. You pay after the work is done.
CHARGING SPEED
A Level 2 charger's speed depends on the circuit behind it. A bigger breaker lets the charger deliver more current, up to what the car and the charger can take. As an example, the table shows the Tesla Wall Connector (Gen 3) as Tesla publishes it; other chargers have their own ratings.
| Breaker | Charging current | Power at 240 V |
|---|---|---|
| 60 A | 48 A | 11.5 kW |
| 50 A | 40 A | 9.6 kW |
| 40 A | 32 A | 7.6 kW |
| 30 A | 24 A | 5.7 kW |
Your car sets a ceiling too. Many cars accept less power than a charger can offer, so a bigger circuit is not always worth paying for. The site check looks at the car's charging limit, your daily driving and what the panel can spare, and only then picks the breaker size.
A NEMA 14-50 outlet sits on a 50 A circuit, and a common rule of thumb is that a charger runs for hours, so it is usually held to 80% of the breaker rating, about 40 A. An outlet already in the garage for a dryer was not necessarily wired for that load, so the electrician checks the wire, the outlet and the breaker first.
Our terms
2 hours
A call back within two hours, Mon–Sat 8 AM–6 PM
Same day
A visit the same day for requests before noon, when a slot is open
2 years
Written labor warranty on repairs and installations
$0 upfront
Repairs are paid after the work is done
INSTALLATION PRICE
The price of a home charger installation depends on a few things you can see in your own garage: the distance from the panel to the charger, the room left in the panel, the charger itself and the permit. The written price lists each one on its own line, so you see what you pay for before you approve it.
| What changes the price | Why | Where it shows up |
|---|---|---|
| Cable run | A longer run from the panel to the parking spot means more wire and more labor, and a run through a finished wall or across the yard needs conduit | Wiring and labor lines |
| Panel capacity | A panel with a free slot takes a new breaker; a full or older panel may need more capacity first | Breaker line, or a separate panel line |
| The charger | A wall-mounted unit, its amperage and any extras such as a longer cable | Equipment line |
| Permit and inspection | Usually required for a new 240 V circuit | Permit line |
A longer run or a full panel changes the price, a short run and a free slot keep it low. You pay the contractor directly. No work starts until you approve the written price.
Service area
Based in Aventura, between Miami and Fort Lauderdale.

Miami, Miami Beach, Aventura, North Miami, Coral Gables, Doral, Hialeah, Kendall, Key Biscayne, Miami Gardens, Miami Lakes, Pinecrest, Palmetto Bay, Cutler Bay, Homestead
Fort Lauderdale, Hollywood, Hallandale Beach, Pembroke Pines, Miramar, Davie, Plantation, Sunrise, Weston, Cooper City, Coral Springs, Coconut Creek, Tamarac, Pompano Beach, Deerfield Beach
Boca Raton, Delray Beach, Boynton Beach, Lake Worth, West Palm Beach, Wellington, Royal Palm Beach, Palm Beach Gardens, Jupiter
FAQ
It depends on the cable run, the room in your panel, the charger and the permit, so the price is written after someone sees the setup, with parts and labor on separate lines. The service call is $89 Monday to Friday and $129 on Saturday, and it is $0 when the work is done on that same visit.
Only if the outlet and its circuit were built for a long, steady load. A NEMA 14-50 on a 50 A circuit is a common setup, and as a rule of thumb the charger then draws about 40 A. A dryer outlet or an old garage outlet needs a check first.
An EV charger is electrical work, and Florida licenses electrical contractors through a state board under the DBPR, where you can look a contractor up. HVACServicesFlorida.com sends one licensed and insured contractor, and the contractor writes the work down before starting.
Usually yes: a new 240 V circuit generally needs an electrical permit and an inspection. Miami-Dade lists the jobs that are exempt, and rules differ from one city to the next, so the building department of your city has the final word on your job.
In a condo, Florida law (section 718.113(8)) generally lets an owner install a charger in the owner's own assigned space, with reasonable requirements from the association and the cost on the owner. HOA rules come from the governing documents, so send them with your request. Condo and HOA managers get a certificate of insurance on request.
The site check answers this. If the panel has room, a new breaker is enough. If it does not, the extra capacity appears as its own line on the written price, and you decide before anything starts. The same contractor handles electrical panel work and standby generator installation.
HVACServicesFlorida.com takes your request and calls you first. One licensed and insured contractor does the work, with a written warranty on labor. You sign and pay the contractor directly. The same contractor also does AC repair.
Didn't find your answer?
Ask it on the call. It comes within two hours during business hours.
Request service
Send a request now and expect a call within two hours, Monday to Saturday. The service call is $0 when the repair is done on the same visit.